Official report of completed and ongoing infrastructure development projects.
Road network, Potable/Recycled water, Sewage, Effluent, Storm water, ICT ducts, Power, Bridges, etc.
Construction of Canal Front Development including Land Filling, Civil, and MEP works.
Design and Construction of 17 nos. of Service Area buildings and 5-year O&M.
CETP, 14 Effluent Pumping stations, RO reject disposal pipeline, and MBR for Recycled water.
10 MLD STP, 6 Intermediate Sewage Pumping Stations, and 70 MLD Pumping Station.
50 MLD Water Treatment Plant, Clear Water Reservoir, and Potable Water Transmission Main.
Soil filling in Plot-A (70 Ha) and Plot-B (92 Ha) with average depth of 2.0m.
ICT Components in Cluster A1 of Activation Area - Design, Install, Integrate, and 5-year O&M.
Interior Works of Special Purpose Vehicle(SPV) building at ABCD Complex in DSIR.
Design, Procurement, Construction, Installation, Testing and Commissioning of ABCD Building in Dholera.
10 MLD Raw water pumping station and Raw Water Transmission Main from Pipli Pumping Station to Water Treatment Plant at TP1.
Flood Protection of Adhiya River between SH-06 and Khun village.
Interior Works of Business and Exhibition Centre (BEC) building in ABCD Complex in DSIR.
State-of-the-art Experience Zone with Physical Model, Projection Mapping and digital walls.